Enhance builds on Insight findings by delivering validated, network-specific scripts that correct the identified misconfigurations, then verifies the result with post-implementation monitoring and an impact report.
What we can evidence
Activating a modulation scheme you already own lifts uplink throughput.
UL256QAM activation raised average uplink user throughput from 4.4 to 6.0 Mbps, with utilisation rising from 0% to above 70%.
Measured before and after the change, against the pre-change baseline.
Retuning downlink power lifts throughput with no new spectrum or hardware.
PDSCH power optimisation raised average downlink throughput from 14.9 to 16.8 Mbps, alongside improved radio quality.
Measured before and after the change, against the pre-change baseline.
Most of the available gain needs no purchase order.
Existing hardware and already allocated licences allow 88.6% of sites to be optimised without additional procurement.
An identified opportunity from asset and licence analysis — not a measured uplift.
Capacity can be recovered from assets already deployed.
Capacity opportunities were identified across baseband and RF power on 27.47% of cells, using assets already deployed in the network.
An identified opportunity from installed-capacity analysis — not a measured uplift.
The problem it addresses
It bridges the gap between knowing what is wrong and implementing the right fix — reducing the risk of manual configuration error, and proving that the changes actually improved performance rather than assuming it.
How it works
Generate
The recommendations from Insight are turned into vendor-specific, validated scripts that are ready for immediate execution. For traffic balance and offload, sector-level utilisation is analysed across carriers and vendor-ready scripts generated automatically.
Safeguard
Every change ships with rollback commands, so a correction can be reversed cleanly if the network responds unexpectedly.
Deploy
You, or your managed-services provider — execute the supplied script. Scripts are auto-generated then expert-validated before release.
Verify
For two weeks after deployment we run weekly check-ins and ingest fresh network data, then issue an impact report quantifying the improvement.
What you receive
- Implementation plan — qualified actions, deployment scope and sequence.
- Execution package — approved scripts, change scope and rollback procedures.
- Before/after validation — measured KPI impact against the pre-change baseline.
- Scale-up roadmap — where validated changes can be safely replicated next.
Proven before we scale
No assumed uplift. Measured uplift. Every optimisation is measured against its pre-change baseline. Changes that meet the agreed KPI guardrails are scaled; changes that do not are stopped, adjusted or rolled back.
Insight identifies what should change. Enhance proves the value of changing it.
Delivers
related
Consulting & Optimisation Services
Diagnose it, fix it with validated scripts, benchmark your autonomy
Service Provisioning for Transport and IP Domains
From resource selection to an approved provisioning output
5G Site Build and Provisioning
One governed workflow from 5G site plan to as-built
4G Site Build and Provisioning
Radio, transport and IP planned together, then reconciled
NetCM
Configuration management you can trust
FlexiPlan
Turn manual planning into governed, repeatable workflows
AiDN Studio
The AI control plane for network operations
