Use casesDomain

RAN

Radio Access Network

Multi-vendor radio: planning, configuration, audit, optimisation, 5G rollout and sharing across 2G–5G and O-RAN.

in domain

Layer-management strategy audit

Keep handover and reselection aligned to the design document

Per-site digital twin

Every site, every layer, one screen

Core network digital twin

835,000 entities, 2.5 million relationships, one graph

Change-script pre-flight validation

Catch the bad script before it touches the network

Network Optimisation

Measured gains, delivered

Configuration Management

One trustworthy view of every parameter — then audit and correct it automatically

RAN audit

Catch the misconfig before it costs you

Golden-parameter audit & optimisation

One baseline, enforced everywhere — audited daily

Closed-loop write-back automation

From detection to correction, hands-off

Config ↔ KPI correlation

Connect the cause to the symptom

RAN sharing

Share infrastructure, split the cost

Performance management

Every KPI, every vendor, one view

Capacity forecasting

Build ahead of demand

Network feature testing

Prove the feature before you trust it

Automated device certification

Certify more devices, faster, with repeatable accuracy

Network swap & modernisation

Swap vendors without losing the plot

5G parameter compliance audit

Compliance before KPIs erode

NR coverage & overshooter detection

Find the gaps in the first two weeks

EN-DC / anchor-carrier audit

Every NR cell paired to the right LTE anchor

PCI / RSI conflict scan

Kill the collisions that break handover

Cross-vendor neighbour audit

Audit the seams no single vendor can see

Day-1 launch readiness

See live-but-not-carrying-traffic at a glance

Site acceptance test automation

Replace days of manual OSS work per site

VoNR / EPS fallback voice audit

Make sure voice actually works on Day 1

5G RRU power & energy audit

Avoid a six-figure OPEX surprise

IP address management

One authority for every address, across every domain

5G Site Build and Provisioning

One governed workflow from 5G site plan to as-built

4G Site Build and Provisioning

Radio, transport and IP planned together, then reconciled